Roll-off dumpsters and swaps that keep the job moving
Jobsite waste does not wait on a weekly route. Metro delivers 10, 15, 20, 30 and 40 yard roll-off containers and swaps them when the box is full.
.jpg)
What slows a jobsite down
- A full container sitting because the swap was booked through a call center
- The wrong size for concrete, dirt or mixed debris
- No local truck when the crane or the pour is tomorrow
How Metro runs the account
- Open-top roll-offs from 10 to 40 yards
- Swaps scheduled with Philadelphia dispatch
- Separate handling for clean concrete and mixed heavy debris
A typical contractor job starts with the material, the yard size and the site access. Published roll-off rates are a starting point. The quote confirms ZIP, weight and how the truck gets in.
Equipment: 10–40 yard roll-off containers. Heavier project loads can move on a 100 yard walking floor or tipper trailer, up to 20 tons.
Talk to Philadelphia dispatch
Owned routes in Philadelphia, Bucks, Montgomery and Delaware counties. A 50-state partner network covers locations outside that territory.

